| System Capacity (4 second headway): | 2.000 – 8.000 passengers per hour | |||||||
| Economically viable from: | Approx. 1500 p/pday | |||||||
| Supervisory System (Network Controls): | Transit Operations Monitoring and Supervision (TOMS) | |||||||
| Vehicles: | 20-25 passenger ParkShuttle | |||||||
| Infrastructure: | Asphalt, at grade | |||||||
| Status: | 2nd generation operational | |||||||
| Configuration: | Line / Network | |||||||
| Operations: | On-demand / On-schedule | |||||||
| Connections: | Ride-sharing (Multiple Origins, Multiple Destinations) | |||||||
| Stations: | On-line / Off-line | |||||||
| Propulsion: | Central AC motor, differential rear axle | |||||||
| Energy supply: | Electric or Hybrid | |||||||
| Maximum speed: | 40 km/h [25m/ph] | |||||||
| Guidance: | FROG-technology |