| Description: | Public Transportation to business park | ||||||
| Operational period: | Phase I: February 1999 – November 2001 Phase II: December 2005 | ||||||
| Patronage: | 1.500 passengers (daily) | ||||||
| Peak Capacity: | 500 p/ph/pd | ||||||
| Service Frequency: | 2.5 minutes (peak hours) On-demand (off-peak hours) | ||||||
| Times of Operation: | 12hrs. p/d, 5 days p/w | ||||||
| Configuration: | Line-connection | ||||||
| Operations: | On-schedule / on-demand | ||||||
| Connections: | Ride sharing, Multiple Origins to Multiple Destinations | ||||||
| Type of vehicle: | 2nd generation ParkShuttle | ||||||
| Number of Vehicles: | 6 | ||||||
| Passengers seated/standing: | 12 / 10+ | ||||||
| Drive: | Electric | ||||||
| Supervisory Control System: | Transit Operations Monitoring and Supervision (TOMS) | ||||||
| Track Length: | 1800 meters | ||||||
| Number of Stations: | 8, on-line | ||||||
| Berths per station: | 4 stations with 2 berths, 4 single berth stations | ||||||
| Crossings for Traffic/Pedestrians: | 6 (3 at grade) / 5 (all at-grade) |