
| System Capacity (4 second headway): | 3.200 - 4.800 passengers per hour | |||||||||
| Economically viable from: | Approx. 300 p/phour or 1500 p/pday | |||||||||
| Supervisory System (Network Controls): | TOMS (Transit Operations Monitoring and Supervision) | |||||||||
| Vehicles: | 6 passenger CyberCab | |||||||||
| Infrastructure: | Asphalt, at grade or elevated | |||||||||
| Status: | Engineering 2nd generation completed | |||||||||
| Configuration: | Network | |||||||||
| Operations: | On-demand / On-schedule | |||||||||
| Connections: | Direct / Ride-sharing (Single Origin, Multiple Destinations) | |||||||||
| Stations: | Off-line | |||||||||
| Propulsion: | Central AC motor, differential rear axle | |||||||||
| Energy supply: | Electric or Hybrid | |||||||||
| Maximum speed: | 40 km/h [25m/ph] | |||||||||
| Guidance: | FROG-technology |