


| Description: | Scenic Connection |
| Operational period: | April - November 2002 (192 days) |
| Patronage: | ± 400.000 passengers |
| Peak Capacity: | 600 p/ph/pd |
| Service Frequency: | 25 seconds |
| Times of Operation: | 12hrs. p/d, 7 days p/w |
| Configuration: | Line-connection |
| Operations: | On-schedule |
| Connections: | Direct (Non-stop) |
| Type of vehicle: | 1st generation CyberCab |
| Fleet Size: | 25 |
| Passengers seated/standing: | 0 / 5 |
| Drive: | Electric |
| Supervisory Control System: | None |
| Track Length: | 700 meters (one-way) |
| Number of Stations: | 2 on-line |
| Berths per station: | 1 |
| Crossings for Traffic/Pedestrians: | 0 / 1 (Elevated) |