
| Description: | PRT Network |
| Operational period: | 2nd half 2009 |
| Peak Capacity: | 500 p/ph/pd currently |
| Service Frequency: | On-demand |
| Times of Operation: | 24hrs. p/d, 7 days p/w |
| Configuration: | Network |
| Connections: | Direct (Non-stop) |
| Type of vehicle: | 2nd generation CyberCab |
| Fleet Size: | 10 (+ 3 Freight Rapid Transit vehicles) |
| Passengers seated/standing: | 4 adults + 2 children |
| Drive: | Electric |
| Supervisory Control System: | TOMS |
| Track Length: | 1200 meters (one-way) |
| Number of Stations: | 2 off-line (+ 3 freight stations) |
| Berths per station: | 6 |
| Crossings for Traffic/Pedestrians: | On podium level |